Showing posts with label Chemguard. Show all posts
Showing posts with label Chemguard. Show all posts

Tuesday, April 23, 2024

Chemguard In-Line Eductors - CE95 & CE60

CHEMGUARD in-line eductors provide an inexpensive and effective method of metering all types of foam concentrate into a water stream. Our brass, corrosion-resistant eductors enable variable metering at 0%, 0.5%, 1.0%, 3.0% and 6.0%. CHEMGUARD in-line eductor system includes the metering valve and an 8-foot pickup-hose assembly.
Features
  • Corrosion Resistant Brass Construction
  • 1-1/2” swivel inlet X 1-1/2”male outlet
  • Eductor rated for optimum flow at 200 PSI (14 Bar)
  • Furnished with 30”(76cm) pick up tube
  • Variable metering valve
  • Removable metering valve
  • A large, easy to read metering dial
  • Ball check valve prevents back flow into foam concentrate
Operating Procedures
  • Must be used with a nozzle of equivalent flow rate
  • Maximum hose lay between eductor and nozzle on level ground using 1½"(3.8 cm) hose is 150 ft.(46m)
  • Maximum hose lay between eductor and nozzle on level ground using 2"(5 cm) hose is 300 ft.(91m)
  • Normal inlet operating pressure at eductor is 200 psi; however, the eductor can be used at lower inlet pressures with a  corresponding reduction in flow rates
* Pressure loss through the Chemguard eductor is approximately 35% of the inlet pressure)
Suitable 
Suitable for use with water,  AFFF, AR-AFFF, Fluoroprotein and Class “A” foam concentrates

CES95 
95 GPM(360) / Brass / Inlet 1.5” NST / 10 LBS.(4.5)
Proportioning Metering Valve .5%,1%,3%,6%

CES60
60 GPM(227) / Brass / Inlet 1.5” NST / 10 LBS.(4.5)
Proportioning Metering Valve .5%,1%,3%,6%



If you have any questions or concerns. Please feel free to contact us any time through this web site or through this E-mail: Sales@TTLCompany.com | Web:http://TTLCompany.com

Sunday, October 16, 2011

Design, Installation, Operation, Maintenance Manual and Product List

Please click on the link below to download DIOM
 KIDDE Design Installation Operation and Manual
 Kidde Full Line Product Items - Part Numbers (2026)

SKUM Design Installation Operation and Manual
 SABO Design Installation Operation and Manual
 CHEMGUARD Design Installation Operation and Manual

If you have any questions or concerns. Please feel free to contact us any time through this web site or through this E-mail: Sales@TTLCompany.com | Web: http://TTLCompany.com

Tài Liệu Hướng Dẫn Thiết Kế, Lắp Đặt & Vận Hành - Kidde Fenwal, Tyco, RLE, AA

Please click on the link below to download DIOM (Tài liệu hướng dẫn Thiết Kế, Lắp Đặt, Vận Hành)

 KIDDE Design Installation Operation and Manual
 Kidde Full Line Product Items - Part Numbers (2024)


If you have any questions or concerns. Please feel free to contact us any time through this web site or through this E-mail: Sales@TTLCompany.com | Web: http://TTLCompany.com